Must by supplied by you...
(You can get all of these items from your
local Wal-Mart or Canadian Tire)
One inexpensive timer.
Peroxide (First Aid Isle)
1 gal. Spring Water
Bag of Perlite (Garden Isle)
Click the pictures below to enlarge.
Unpack your MES and lets get started!
NOTE: NEW DESIGN CHAMBERS HAVE
MANY HOLES THROUGHOUT! MUCH BETTER DESIGN AND LESS CHANGE OF GREEN MOLD
ACCURING! Pics below do not show this new design but you are
to follow the instructions as follows:
First take everything out of your Tower and clean it out with soap and water.
 |
Lower the USD, bottom down, to the center/bottom of the MES tower. |
 |
 |
Notice the 'notch' that you will be running the cord through. Then
connect it to the power unit as you see here. |
 |
 |
Place the lid on gently until it is time to place water into the tower. |
 |
If you have one chamber then, of course, ignore the
info. regarding the 2nd Chamber. NOTE:
Take a rubber band and some Reynolds Wrap and cover the unused outlet.
It is designed to expand at your leisure. |
 |
 |
If you have one chamber then plug up the 2nd hole with
some Saran wrap and a rubber band. It will still be there if you
decide to 'double up' your growing space. |
 |
 |
If you have one chamber then, of course,
ignore the info. regarding the 2nd Chamber. Also the fitting that is
connected to the chamber itself will be 'L' shaped. |
 |
 |
Connect a small piece of tubing to the air pump.
Notice: a small piece of tubing may be INSIDE
the another tubing..check for it closely. |
 |
 |
Slide the smaller tubing over the 1" small tubing ...as you see here. |
 |
 |
Take the other end of the clear tubing and connect them to the tower. |
 |
|
Here is what a two chambered MES set-up should look like! |
 |
Mix 1 part Peroxide to 10 parts Spring water and pour it into
the tower.
MES - Water Mark!
This is
what you should do. Place the Fogger device into the tower. Fill the water just past it and view the
water indicator. Most of
the time you will not see the water because it is just below the indicator line.
Fill it a little more until you JUST see the water...when you do...MARK IT!
Now...add one more inch of water and MARK IT!
Keep the water between
these two marks at all times.
NOTE: Add a 'splash'
of peroxide every time you add more water to the tower. Wait 25 min.
before using.
Plug the Air Pump and the USD (fogger) into the timer. You
will need to get an adaptor to both can be plugged into the same inlet (socket).
You will allow both to run for ATLEAST 1 minute ON and 3:00 hours OFF.
No more then 3 min. ON and 3:00 OFF.
|
If you are going to be adding mushroom CAKES to the
chamber then...
Place 1" of Perlite to the bottom of the chamber. Mix 1
part Peroxide to 10 parts Spring water (mix in a separate container) and pour it
onto the Perlite. Pour a little at a time ...you want to give the Perlite
a chance to soak up the water and expand as much as possible. You need to
wait 1/2 hour to allow the Peroxide to complete the sterilizing process of the
Perlite.
|
|
If you are going to be doing the Casing with colonized
grain then...
Casing &
MES....PERFECT COMBINATION!
|
The new MES set-up directions.
Work in Progress
|